Google
 

Tuesday, April 29, 2008

The new edition of VMware and hypothetical conversion suite "Infrastructure" to year Utide load - - the package for SMB in the same time release

The United States VMware announced that October 8th, new edition of the hypothetical conversion software suite "VMware Infrastructure" which includes up-to-date hypothetical conversion hyper visor "ESX Server 3.5" is shipped into year. Small-to-medium-sized scale enterprise (for SMB) it throws also the volume license package to the same time.

According to the announcement of VMware, also new version "VirtualCenter 2.5" of the hypothetical environmental control tool is included in new Infrastructure. At the same company we designate the start of shipment of Infrastructure new edition as within year, we have not made clear concerning detailed time.

In Infrastructure new edition, supporting the Ness Ted page table function for the TCP Segment off load and the memory imagination conversion which decrease the load of CPU SATA (serial ATA) in addition to local storage and 10GB Ethernet and InfiniBand interface. Quasi- imagination conversion (paravirtualization) by the guest OS (Linux) also performance improvement and correspondence etc. to the hypothetical machine of 64GB memory loading and the physical machine of 128GB memory loading are included.

In addition, if the Storage VMotion function which is loaded onto Infrastructure is used, maintenance of the machine and while executing load balancing just, the hypothetical machine the question っ callous which is made to move to another data store becomes possible. Concerning the constitution job of the hypothetical machine, it became easier than past depending upon Guided Consolidation.

VMware Update Manager at one of the new coemponents with Infrastructure, supports the introduction job of the security patch and the bug correction program. Function to do with all hypothetical machines, power without having been turned on, becoming suspended state and doing to reach, there are no times when automatic operation update/correction process receives influence to that.

In addition, also the Distributed POWER Management which contributes to the reduction of the electricity consumption quantity by the fact that power source of the server resource is turned off briskly was loaded anew.

No comments: